I just got the email from Roger Becker that I have been waiting for. My car will be built next week, #1716 and will be shipped by year's end. Looking at a February delivery. Not bad since I couldn't get any info from Symbolic, but it's nice to have the senior engineers' ear.
Deposit on 1/13/03 with Beverly Hills.
I'm used to waiting by now, I have had a deposit on a 360 f-car now turned into a 430 for about the same time and looking at a late 05-early 06' delivery.
P.S. Sownman, there coming our way.
I think I'll call Nick down at the dealer and tell him my Vin #!!!!!!
Deposit on 1/13/03 with Beverly Hills.
I'm used to waiting by now, I have had a deposit on a 360 f-car now turned into a 430 for about the same time and looking at a late 05-early 06' delivery.
P.S. Sownman, there coming our way.
I think I'll call Nick down at the dealer and tell him my Vin #!!!!!!